Skip to main content

Expera Specialty Solutions – IB MACT

Expera Specialty Solutions - IB MACT View from Ground of Equipment Installation

The Expera IB MACT installation project brings the Expera facility into compliance with current Industrial Boiler MACT Air Emissions Standards. Boldt’s work included the addition of an air filtration system to remove chlorine from the exhaust of coal-fired boilers.

Project scope included the installation of the pulse jet fabric filter baghouse, Dry Sorbent Injection System, 1250 HP ID Fan and additional ductwork to route the boiler flue gases from the three existing power boilers to the Sorbent Injection System through the PJFF and back to the existing stack.

Client

Expera Specialty Solutions

Location
Kaukauna, Wisconsin
Architect/Engineer

PEC / Poyry / The Boldt Company

Boldt Role
Construction Manager
Project Type
Equipment Installation

MARKETS
Pulp and Paper

Project Highlights

  • Boldt put together a very detailed lift plan for each piece of ductwork.
  • To help the tradespeople visualize the final ductwork and structural steel, A360 Software was loaded on iPads and iPhones to allow for viewing the 3D rendering of the final install.