Expera Specialty Solutions – IB MACT
The Expera IB MACT installation project brings the Expera facility into compliance with current Industrial Boiler MACT Air Emissions Standards. Boldt’s work included the addition of an air filtration system to remove chlorine from the exhaust of coal-fired boilers.
Project scope included the installation of the pulse jet fabric filter baghouse, Dry Sorbent Injection System, 1250 HP ID Fan and additional ductwork to route the boiler flue gases from the three existing power boilers to the Sorbent Injection System through the PJFF and back to the existing stack.
Client
Expera Specialty Solutions
Location
Kaukauna, Wisconsin
Kaukauna, Wisconsin
Architect/Engineer
PEC / Poyry / The Boldt Company
Boldt Role
Construction Manager
Construction Manager
Project Type
Equipment Installation
Equipment Installation
MARKETS
Pulp and Paper
Project Highlights
- Boldt put together a very detailed lift plan for each piece of ductwork.
- To help the tradespeople visualize the final ductwork and structural steel, A360 Software was loaded on iPads and iPhones to allow for viewing the 3D rendering of the final install.